Installing 110 kV pressure ground cables and fiber cables to connect Al Salam transformer station, voltage 380/110 / 13.8 P, 1- Al Baida transformer station 2- Al Haram transformer station 3- Bir Ali transformer station 4- Islamic University transformer station

Installing 110 kV pressure ground cables and fiber cables to connect Al Salam transformer station, voltage 380/110 / 13.8 P, 1- Al Baida transformer station 2- Al Haram transformer station 3- Bir Ali transformer station 4- Islamic University transformer station

Scope of the contract Executing all civil works related to the project, such as excavation, trenching and backfilling
Asphalting and implementing concrete culverts for cables, as well as supplying and installing both of the following:
(Welding room manholes, fiber handholes, thermal protection sand, and fiber tubes
Cable tiles, protection grille and warning tape)

Project date: 2014

Project Period: forty eight

Owner: Sec